Showing all 6 results

Port Almeria 01

9.95

5184 x 3101 px

MV Tiwala loading big bags at Ribera I berth of the port of Carboneras. MV Tiwala, built in 2008, is a vessel of 5484 mt DWAT with 106,78m LOA and 15,3m beam.

Port Coruna 01

9.95

1600 x 1200 px

Loading operations of petroleum coke at Centenario Sur berth of A Coruña port. MV Don with destination the port of Valencia.

Port Coruna 02

9.95

1600 x 1200 px

Loading operation of petroluem coke to MV Don at Centenario Sur quay of Coruna port. One Gottwald mobile crane from TMGA works 8 hours to load about 5000 mt of petroleum coke.

Port Coruna 11

9.95

1600 x 980 px

Berthing manoeuvring of MV Varnadiep at Centenario Norte quay in the port of A Coruña. She is ready to start loading operations after passing holds inspections and carrying out initial draft survey.

Port Tarragona 08

9.95

1572 x 979 px

 

Spout trimmed of the carrgo, under the supervision of an officer. The bulk in the bold must be correctly trimmed in order to secure the vessel’s stability. Vessel’s and cargo safety is Captain’s responsability who must ensure that the stevedores are doing it at his entire satisfaction.

Port Tarragona 10

9.95

1145 x 1274 px

Completing the loading of hold no.1 of MV Ijsseldiep with petroleum coke. Navarra quay at the port of Tarragona.