Showing all 2 results

Port Coruna 02

9.95

1600 x 1200 px

Loading operation of petroluem coke to MV Don at Centenario Sur quay of Coruna port. One Gottwald mobile crane from TMGA works 8 hours to load about 5000 mt of petroleum coke.

Port Coruna 12

9.95

1600 x 869 px

The Centenario Sur quay at the port of Coruña has a total length of 385 m and a draft of 11m un calado de 11m. It is mainly used to load or discharge general and dry bulk cargoes.