Showing all 3 results

Port Tarragona 01

9.95

1600 x 846 px

The exporter must hire the stevedoring services and the transport according to the timing assigned for the operation. Custom clearance must be arranged and also quality and weight controls by a surveyor.

Port Valencia 16

9.95

1600 x 679 px

Stevedores are ready to start the loading operations as soon as the vessel is berthed at the port of Valencia. Surveyors are also ready to carry out the draft survey and cargo holds inspection.

Puerto de Tarragona 09

9.95

1600 x 868 px

 

Quality surveyor collecting samples during petroleum coke loading operations in Tarragona. Samples are taken at regular intervals from the same grab before it is lifted on board. It is very important to carry out a correct sampling to obtain a represntative sample of the whole cargo.