Showing 129–144 of 145 results

Port Valencia 09

9.95

5034 x 2922 px

The port of Valencia discharge petroleum coke bound to the cement plants in Buñol and Valderrivas. It comes in shipments btween 20.000 and 50.000 mt. The transport to Buñol is made by truck and to Valderrivas by truck and train.

Port Valencia 10

9.95

1564 x 993 px

APM container terminal at the Levante quay of the port of Valencia. 12 container cranes between 40 and 65 tonnes.

Port Valencia 11

9.95

1600 x 1129 px

Container ships of the shipping line Mediterranean Shipping Company, at the port of Valencia. MSC operates more than 450 ships globally, being the second largest shipping line in container transport volume.

Port Valencia 12

9.95

1575 x 675 px

Container ship in the port of Valencia. The main traffic of the port is the containers. The main shipping lines call Valencia.

Port Valencia 13

9.95

1596 x 976 px

The port of Valencia counts with more than  13000 lineal meters of berths with drafts of  9,5 to 17m. It has 56 ha of storage and operational areas for all kind of goods and containers.

Port Valencia 14

9.95

1600 x 800 px

The port of Valencia has a traffic of more than 50 milion tons a year. With more than 3,7 million containers is the fifth port by traffic in Europe.

Port Valencia 15

9.95

1578 x 775 px

The MSC container terminal in Valencia counts with 8 gantry cranes of 65t. They have an outreach of 66m which allow them to operate 2 Super Post Panamax.

Port Valencia 16

9.95

1600 x 679 px

Stevedores are ready to start the loading operations as soon as the vessel is berthed at the port of Valencia. Surveyors are also ready to carry out the draft survey and cargo holds inspection.

Port Valencia 17

9.95

1600 x 1049 px

Berthing operation at the Xitá quay of the port of Valencia. Pilots, tugs and dockers from the port of Valencia offer those services to ensure a succesful operation.

Port Valencia 18

9.95

1251 x 942 px

The biggest ports have berths dedicated to the handling of bulk cargoes. Special environmental control measures are taken to ensure clean and safe operations.

Port Valencia 19

9.95

1600 x 1200 px

 

A good planning is needed to optimize the resources to perform a loading operation. Thus, we will reduce the cost of the port operation. We sould count on the best stevedoring and agency services.

Port Valencia 21

9.95

1564 x 1051 px

Two mobile cranes are enough to load 6000 mt of petroleum coke in less than 12 hours at the port of Valencia. The quay is later swept and cleaned, ready to receive another shipment.

Port Valencia 22

9.95

1600 x 1200 px

Mobile crane for the loading of petroleum coke at the port of Valencia. Mobile cranes substituted the old port cranes on rails in most of the ports. They are more polivalent and flexible for handling all kind of goods.

Port Valencia 24

9.95

1600 x 733 px

Loading operation of petroleum coke at the port of bound to Italy. Petroleum coke is a solid fuel used to produce clinker.

Port Valencia 25

9.95

5183 x 2191 px

The port of Valencia will invest more than 1000 million Euros in the new containers terminal at the North quay. It will count with to total surface of more than 1.300.000 sqm for storage and operation.

Port Valencia 26

9.95

4621 x 2625 px

The port of Valencia is today the biggest in cargo traffic in Spain with more than 64 million tons, handling 5 million of cantainers a year.